Professional Plastering & Plumbing in Huntingdon

May 11, 2009Daily Archives

Bathroom refit and tiling – Hinchingbrooke

The old suite was replaced with a new suite.  Furniture was put together and the floor and walls were tiled.  The tiling on the walls included a chrome beading.  A towel rail radiator was installed.

250 x 300 tiling behind shower fitting250 x 300 basin with red and white tiles and chrome trim


Bathroom refit in Huntingdon Town Centre Flat

This bathroom refit in a flat in Huntingdon town centre involved removal of a disabled bath and old suite and replacing with a new suite and shower.

Bathroom furniture was put together, a false wall was constructed to conceal pipework and the ceiling and two walls were skimmed.  The other walls and the floor were tiled.

250 x 300 disabled bath250 x 300 old basin and toilet

250 x 300 shower

250 x 300 shower wall work in progress250 x 300 false wall250 x 300 back wall plastered250 x 300 false wall tiled250 x 300 loo & basin after350 x 250 bath



We can remove and replace radiators and pipework can either be exposed or concealed in line with your preference.

Here are some photos of recent work with radiators

chrome channelled 200 x 250chrome not channelled   constructed wc 200 x 250  london 200 x 250white 200 x 250  250 x 200 radiator with white toilet and white furniturewhite with wc 250 x 200  radiator cover 250 x 200

Reddit button Linkedin button Delicious button Digg button Flickr button Youtube button
Content Protected Using Blog Protector By: PcDrome.

Featuring Recent Posts Wordpress Widget development by YD