Professional Plastering & Plumbing in Huntingdon

TilingCategory Archives

Brits spend £235m per year on DIY mistakes!

I have just read a report over at everyinvestor.co.uk saying “House-proud Brits spent £235million putting right DIY disasters in the last year, according to new research from Clydesdale and Yorkshire Banks.  The Banks found that one in 10 ‘DIYers’ had paid out up to £500 to fix their own DIY.” Continue reading »

Share

Bathroom refit with tile inserts

1 300 x 200 bath 1This bathroom was refitted to change the toilet, basin, radiator, bath and shower. 

The tiles used had different coloured inserts

 

 

 

2 300 x 200 bath 2

 

 

 

 

 

 

3 300 x 200 bath tiling before grout and inserts

 

 

 

 

 

 

4 300 x 200 toilet and basin

 

 

 

 

 

 

5 300 x 200 basin

 

 

 

 

 

 

6 200 x 250 bath and shower7 200 x 250

 

 

 

 

 

 

 

8 200 x 250 radiator9 200 x 250 shower

 

 

 

 

 

 

 

10 200 x 25011 200 x 250 green tile insert

Share

Bathroom refit with basin unit

1 250 x 200 bath controlsFor this bathroom refit the bath, basin, toilet, shower and radiator were replaced and the basin was mounted onto a vanity unit with marble top.

 

 

 

 

2 250 x 300 basin unit

 

 

 

 

 

 

 

 

3 250 x 300 shower 1

 

 

 

 

 

 

 

 

5 250 x 300 radiator 1

 

 

 

 

 

 

 

 

4 250 x 300 valve

 

 

 

 

 

 

 

 

6 250 x 300 radiator 2

 

 

 

 

 

 

 

 

7 250 x 300 basin unit

Share

Bathroom refit cream tiles and border

1 250 x 300 basin and tilingThis bathroom refit near Peterborough replaced the toilet, basin, bath, radiator and shower.  The ceiling was skimmed smooth and the floor and walls were tiled.

 

 

 

 

 

 

2 250 x 300 tiled floor

 

 

 

 

 

 

 

 

3 250 x 300 basin and toilet

 

 

 

 

 

 

 

 

4 250 x 300 basin toilet and radiator

 

 

 

 

 

 

 

 

5 250 x 300 bath

 

 

 

 

 

 

 

 

6 250 x 300 shower

Share

Bathroom refit with shower and bathroom furniture

1 250 x 300 shower, cabinet and basinThis bathroom in Huntingdon was refitted to remove the bath and fit a large shower enclosure with a tall cabinet.  The basin and toilet were replaced, the floor was tiled, the ceiling was skimmed and the walls were painted.  Spotlights were fitted to the smooth ceiling.

 

 

 

 

 

2 250 x 300 basin

 

 

 

 

 

 

 

 

 

3 250 x 300 toilet

 

 

 

 

 

 

 

 

4 250 x 300 radiator

 

 

 

 

 

 

 

 

5 25 x 300 shower

 

 

 

 

 

 

 

 

6 250 x 300 valve

Share

Ensuite refit in Stukeley Meadows

250 x 300 shower and tilingThis ensuite in Stukeley Meadows was refitted with tiling, replacing radiator for towel rail radiator, ceiling skim with spotlights, basin and toilet refit, and shower refit.

 

 

 

 

 

 

250 x 300 toilet basin and tiling250 x 300 basin

 

 

 

 

 

 

 

 

 

250 x 300 radiator250 x 300 toilet

Share

Ensuite with porcelain tiles

250 x 300 shower 1This ensuite refit in Huntingdon consisted of making alterations to allow as large an enclosure as possible to fit into the ensuite.  The ceiling was skimmed, the walls and floor were tiled with porcelain tiles, and a radiator was replaced with a towel rail radiator.

 

 

 

 

 

250 x 300 enclosure and toilet

250 x 300 shower  light on

 

 

 

 

 

 

 

 

250 x 300 tiling and concealed valve

Share

Bathroom refit and tiling – Hinchingbrooke

The old suite was replaced with a new suite.  Furniture was put together and the floor and walls were tiled.  The tiling on the walls included a chrome beading.  A towel rail radiator was installed.

250 x 300 tiling behind shower fitting250 x 300 basin with red and white tiles and chrome trim

Share

Bathroom refit in Huntingdon Town Centre Flat

This bathroom refit in a flat in Huntingdon town centre involved removal of a disabled bath and old suite and replacing with a new suite and shower.

Bathroom furniture was put together, a false wall was constructed to conceal pipework and the ceiling and two walls were skimmed.  The other walls and the floor were tiled.

250 x 300 disabled bath250 x 300 old basin and toilet

250 x 300 shower

250 x 300 shower wall work in progress250 x 300 false wall250 x 300 back wall plastered250 x 300 false wall tiled250 x 300 loo & basin after350 x 250 bath

Share

Creating a second ensuite

250 x 300 shower finishedAn airing cupboard on a landing with hot water tank was relocated and this extra space plus part of the bedroom were sectioned off to construct an Ensuite with wc, basin and shower.  This was part of a larger project where other work was also done.

 

 

 

 

 

 

250 x 300 shower and toilet200 x 150 pic 1200 x 150 pic 2

 

 

 

 

200 x 150 pic 3200 x 150 pic 4

 

 

 

 

 

200 x 150 pic 5200 x 150 pic 6

 

 

 

 

 

200 x 150 pic 7200 x 150 pic 8

 

 

 

 

 

200 x 250 pic 9200 x 150 pic 10

 

 

 

 

 

 

 

200 x 150 pic 11200 x 150 pic 12

 

 

 

 

 

200 x 150 pic 13200 x 150 pic 14

 

 

 

 

 

200 x 150 pic 16200 x 150 pic 17

 

 

 

 

200 x 150 pic 18200 x 150 pic 19

 

 

 

 

 

 

 

200 x 150 pic 20200 x 150 pic 21

 

 

 

 

 

 

 

200 x 150 pic 22200 x 150 pic 23

 

 

 

 

 

 

 

200 x 150 pic 24200 x 150 pic 25

 

 

 

 

 

 

 

200 x 150 pic 26200 x 150 pic 27

 

 

 

 

 

 

 

200 x 150 pic 28200 x 150 pic 29

 

 

 

 

 

 

 

200 x 150 pic 30200 x 150 pic 31

 

 

 

 

 

 

 

200 x 150 pic 32200 x 150 pic 33

Share
Reddit button Linkedin button Delicious button Digg button Flickr button Youtube button
Content Protected Using Blog Protector By: PcDrome.

Featuring Recent Posts Wordpress Widget development by YD