Plumbing Apprentices and it’s challenges for employers

Tim nudged me this morning to listen to a discussion that was going on at bbc radio cambridgeshire. The conversation was with a local college in Cambridgeshire promoting apprenticeships in plumbing. (You can hear me at 2:11:39)

We fully support the plumbing apprenticeship schemes and have been liaising with different cambridgeshire organisations and professional bodies over the last few years to see how best to make this work for us as a small business and for the plumbing apprentice themselves so that we can properly support them as they gain plumbing experience in the workplace.

We are currently trying to take on a plumbing apprentice for Sept 2011 on 16 hours per week but it’s proving to be difficult as our local college (Huntingdonshire Regional College) are taking the stance of not supporting apprentices for anything less than 30 hours per week. This is a huge barrier to small firms and employees.  Small firms like ours may not have enough plumbing work for 30 hours a week but they do have for 16 hours a week and hence the number of work placements are reduced by colleges taking this view.

The National Apprenticeship Organisation have confirmed to me that this is at the discretion of the local colleges but their guidelines state it is purely a recommendation and not a mandatory requirement and placements should still be offered part time ie; from 16 hours.

I am not writing this article as an authority on plumbing apprentices, just merely as a customer of the college and a local employer trying to support the plumbing apprenticeship schemes locally so please excuse me if my words are not entirely 100% accurate to the letter of the law as I am just telling a story of our experience with plumbing apprentices and trying to give a few tips to other plumbing firms who may have the opportunity to support a plumbing apprentice with a work placement.

There are young people who are re-training or who have a second job as they cannot survive on £97 per week. Some of these are even willing to pay for the college courses themselves but cannot get a work placement. They may have more of a chance if the college relaxed the 30 hour a week jobs-worth rule.

Interesting that on the radio show it was announced that only 15% of plumbing apprentices get a work placement to enable them to complete their course. Such a shame that we were one of the companies that were offering jobs within the 15% that now cannot!

I’m curious to know how this rule ever came in in the first place so if anyone knows, please feel free to leave a comment below :)

The challenges we have had as a local plumbing firm in Huntingdon are as below:

1)  Funding

This is not automatic or standard. There are requests made by colleges for “employers contribution” depending on the apprentice’s age and grades (I think).  This means that apprentices are not free and the employer picks up a cost for this. Now if you consider the apprentice rate for 1st year is £2.50 per hour this “employers contribution” is equivalent to the cost of 200 hours worth of salary so it is not a small amount in proportion to salary costs.

It is also worth looking at Private Training Providers rather than Colleges as most of these do not ask for “employer contributions” as they feel the level of funding they receive per learner is adequate and it is not necessary to ask for the contribution from employers.

A list of providers can be found on the national apprenticeship website and they are a friendly and helpful bunch of people who can help you find other training organisations if you give them a call.

2) Key skills / Functional Skills

The name of this keeps changing but it is used to describe basic maths and english skills. As an employer I don’t have a problem with paying for technical plumbing training but I do have a problem with funding maths and english training as it is not relevant or particularly beneficial to a trainee plumbers job role.

As an employer I do not want them to be able to write a poem or be a whizz at quadratic equations .. I just want them to learn how to change a tap!

The response I have had in the past is that apprentices need to be equipped with basic maths and english skills as part of their plumbing apprenticeship in case they ever want to run their own plumbing business.

Hello? I am an employer.. why on earth am I paying for this with the “employers contribution”?

The employer doesn’t want this and neither does the learner!

As an apprentice plumber or trainee plumber it is extremely unlikely that they will ever produce their own customer quotes, handle customer correspondence or enquiries, handle pricing, costs, or anything other than the operational and technical aspects of a plumbing job role.

Perhaps I am old fashioned but I believe there should be every opportunity for a young person who has not left school with a certain level of educational attainment to go out and find a job, learn a trade, develop their technical skills.

It can also extremely de-motivate a youngster on an apprenticeship in the workplace.

Some youngsters want to forget about how well they did at school in maths and english and move on to something more positive and focus instead on developing their practical skills. Everyone I have spoken to absolutely hates the “functional skills” element of apprenticeships because they want to leave their educational attainment behind and not have to undergo any maths and english lessons. Their words are “do I really have to?” or “I really don’t want to do that” or “why is that relevant to plumbing” and I don’t have an answer for them.

Some training providers even have it written into contracts that if the apprentice drops out or fails to complete their “functional / key skills” element of their apprenticeship then the employer will be liable for the training costs of a maximim of £2000 approximately!  Talk about putting the employer and apprentice under pressure!

It’s not as if it is only a little bit of “functional / key skills” either, it’s actually a lot! Our apprentice unfortunately did a whole year of just this with very little practical plumbing in his first year at all. Personally I think he deserves a medal for enduring this and being patience to get on to the practical plumbing in his second year. Many would have given up I fear.

3) Organisation

Without going too much into specifics I cannot help but feel that things could be better organised. Quite often I get the impression with colleges/training providers/connexions/job centre/national apprenticeship organisation/assessors etc that the left hand doesn’t know what the right hand is doing.  Ultimately it is the learner that suffers from this disorganisation.

Questions to ask if you are thinking of taking on a plumbing apprentice

Some of these questions may help you to reduce surprises throughout the duration of the plumbing apprenticeship. Feel free to add your own as a comment if you feel it would help other small employers…

* Is there a cost to me as the employer if the apprentice does not complete their course?

* How will assessor visits be organised and communicated?

* What protective clothing and equipment is needed for the entire duration of the course? (to avoid surprises)

* Is an element of gas work required if the plumbing apprentice is only working in a wet plumbing company?

* When is first aid covered? (so you can make own arrangements if you wish to)

* Will I get a refund of the employers contribution if the college fails to deliver practical plumbing in the first year?

I hope this article is of some help to anyone thinking of taking on a plumbing apprentice. It is written with the intention of helping small local plumbing businesses support young plumbing apprentices looking for work-placements.

 

 

Share

Bathroom refit with basin unit

1 250 x 200 bath controlsFor this bathroom refit the bath, basin, toilet, shower and radiator were replaced and the basin was mounted onto a vanity unit with marble top.

 

 

 

 

2 250 x 300 basin unit

 

 

 

 

 

 

 

 

3 250 x 300 shower 1

 

 

 

 

 

 

 

 

5 250 x 300 radiator 1

 

 

 

 

 

 

 

 

4 250 x 300 valve

 

 

 

 

 

 

 

 

6 250 x 300 radiator 2

 

 

 

 

 

 

 

 

7 250 x 300 basin unit

Share

Bathroom refit with shower and bathroom furniture

1 250 x 300 shower, cabinet and basinThis bathroom in Huntingdon was refitted to remove the bath and fit a large shower enclosure with a tall cabinet.  The basin and toilet were replaced, the floor was tiled, the ceiling was skimmed and the walls were painted.  Spotlights were fitted to the smooth ceiling.

 

 

 

 

 

2 250 x 300 basin

 

 

 

 

 

 

 

 

 

3 250 x 300 toilet

 

 

 

 

 

 

 

 

4 250 x 300 radiator

 

 

 

 

 

 

 

 

5 25 x 300 shower

 

 

 

 

 

 

 

 

6 250 x 300 valve

Share

Ensuite refit in Stukeley Meadows

250 x 300 shower and tilingThis ensuite in Stukeley Meadows was refitted with tiling, replacing radiator for towel rail radiator, ceiling skim with spotlights, basin and toilet refit, and shower refit.

 

 

 

 

 

 

250 x 300 toilet basin and tiling250 x 300 basin

 

 

 

 

 

 

 

 

 

250 x 300 radiator250 x 300 toilet

Share

Bathroom refit and tiling – Hinchingbrooke

The old suite was replaced with a new suite.  Furniture was put together and the floor and walls were tiled.  The tiling on the walls included a chrome beading.  A towel rail radiator was installed.

250 x 300 tiling behind shower fitting250 x 300 basin with red and white tiles and chrome trim

Share

Bathroom refit in Huntingdon Town Centre Flat

This bathroom refit in a flat in Huntingdon town centre involved removal of a disabled bath and old suite and replacing with a new suite and shower.

Bathroom furniture was put together, a false wall was constructed to conceal pipework and the ceiling and two walls were skimmed.  The other walls and the floor were tiled.

250 x 300 disabled bath250 x 300 old basin and toilet

250 x 300 shower

250 x 300 shower wall work in progress250 x 300 false wall250 x 300 back wall plastered250 x 300 false wall tiled250 x 300 loo & basin after350 x 250 bath

Share

Creating a second ensuite

250 x 300 shower finishedAn airing cupboard on a landing with hot water tank was relocated and this extra space plus part of the bedroom were sectioned off to construct an Ensuite with wc, basin and shower.  This was part of a larger project where other work was also done.

 

 

 

 

 

 

250 x 300 shower and toilet200 x 150 pic 1200 x 150 pic 2

 

 

 

 

200 x 150 pic 3200 x 150 pic 4

 

 

 

 

 

200 x 150 pic 5200 x 150 pic 6

 

 

 

 

 

200 x 150 pic 7200 x 150 pic 8

 

 

 

 

 

200 x 250 pic 9200 x 150 pic 10

 

 

 

 

 

 

 

200 x 150 pic 11200 x 150 pic 12

 

 

 

 

 

200 x 150 pic 13200 x 150 pic 14

 

 

 

 

 

200 x 150 pic 16200 x 150 pic 17

 

 

 

 

200 x 150 pic 18200 x 150 pic 19

 

 

 

 

 

 

 

200 x 150 pic 20200 x 150 pic 21

 

 

 

 

 

 

 

200 x 150 pic 22200 x 150 pic 23

 

 

 

 

 

 

 

200 x 150 pic 24200 x 150 pic 25

 

 

 

 

 

 

 

200 x 150 pic 26200 x 150 pic 27

 

 

 

 

 

 

 

200 x 150 pic 28200 x 150 pic 29

 

 

 

 

 

 

 

200 x 150 pic 30200 x 150 pic 31

 

 

 

 

 

 

 

200 x 150 pic 32200 x 150 pic 33

Share

Construction of a room for downstairs toilet

200 x 250 finished with door ajarThe brief was to construct a downstairs cloakroom from within a utility room.  A downstairs cloakroom was created from scratch for this customer who found it difficult to go upstairs in St Ives.

A space was identified downstairs next to the kitchen in the utility room  and a room was created with stud work, door frame, plaster board, all walls were skimmed inside and out, skirting board fitted and a door hung. 

Once this was done a W.C. was installed with a hand basin.  A radiator was also installed.

 

200 x 250 finished with wc and radiator200 x 250 gutted

 

 

 

 

 

 

 

200 x 250 studwork200 x 150 pipework

 

 

 

 

 

 

 

200 x 150 skirting and skimmed200 x 250 plasterboard

Share

Ensuite Refit 1 – Huntingdon

Bathroom refit with shower, bath, wc, basin, plastered ceiling and walls, tiling to floor and walls

The photos below show this project in progress in Huntingdon.  The old shower, wc, basin and false wall removed which immediately created a light airy room.  The waste stack boxing in was removed and a new stud wall was created with alcoves for basin and swivel storage mirrors. 

The ceiling and all walls plastered (backing plaster and skim).  A concealed wc was then fitted with access to the cistern lid by lifting up black marble worktop.

The ceiling and all walls plastered (backing plaster and skim).  A concealed wc was then fitted with access to the cistern lid by lifting up black marble worktop.

 A 900mm x 900mm Quadrant shower cubicle was then fitted with concealed shower valve and a 2 bar pump.

 Tiling was then done to floor and shower cubicle walls.  The Pull light switch was moved from within the en-suite and put onto the outside wall.  Spotlights were installed in alcoves and shower spotlight.  Painted white & black for modern finish.

 200 x 250 Ensuite refit 2 Huntingdon finished  200 x 250 shower  150 x 200 ceiling with old light  150 x 200 old toilet plumbing

150 x 200 old plumbing  150 x 100 old plumbing 2  150 x 100 studwork for recess

250 x 200 old ceiling artex  250 x 200 plastered recess  150 x 200 shower pipework

200 x 150 skimming on stilts  200 x 250 skimming recess  250 x 200 skimmed recess

250 x 200 tiling to shower cubicle before tray  200 x 250 tiled cubile  200 x 250 tiled floor and painted recess no radiator  200 x 250 recesses painted

200 x 250 recess with mirrors and concealed toilet  250 x 200 basin in recess  250 x 200 concealed wc

Share

Ensuite refit 1 – Stukeley Meadows

150 x 200 finished toilet radiator shower cubicleEnsuite refit – with tiling, & plastering ceiling. The old suite in Stukeley Meadows was removed and replaced with new suite.  The ceiling made smooth over patterned artex.

The floor and walls were tiled and a shower installed.A Towel rail radiator was also installed.

This customer asked us back to do their main bathroom refit and also a garage conversion.

 

200 x 250 shower cubicle before tiling

200 x 150 gutted    150 x 200 shower boarded  150 x 200 shower tray in progress  150 x 200 ceiling skimmed   150 x 200 basin with cabinet and mirror  150 x 200 finished basin and cabinet  150 x 200 finished shower cubicle with door closed   150 x 200 finished shower cubile side view 200 x 250 finished toilet radiator and basin and tiling  200 x 250 shower cubicle and tiling

Share