Papworth bathroom bathstore, originally uploaded by maxxy2008.

This project for a new bathroom in Papworth, Cambs involved installing new bathroom suite, with tiling to walls and floor by us, ceiling was plastered by us, and bathroom accessories fitted.

Share

Corner Bath, brown and beige tiles, lovely Bathstore example

Lovely example of Bathstore corner bath with toilet, basin, and shower. This bathroom is shown with brown and beige tiles and is a good example of how a different bathroom layout can make your bathroom luxurious and make the best use of space available. … Continue reading »

Share

Cupboard Under Stairs are very handy indeed!

Having a built in wardrobe is great for best use of space as floor to ceiling space is utilised and no need to purchase a wardrobe for exact fit!

We have done quite a few of these now and here is a picture of a recent cupboard under the stairs that was built to use space in a living room.

A door was sourced to match other doors (apart from the one leading into the garage that you can see on this pic) and coving was fitted to match the existing coving.

Costs including all materials and labour are usually around £450 so it’s probably cheaper than you think to make use of wasted space!

Built in wardrobe and skim

Having a built in wardrobe is great for best use of space as floor to ceiling space is utilised and no need to purchase a wardrobe for exact fit! We have done quite a few of these now and here are some pictures of work done this week.

Share

Arched Alcove with Cupboard – make good and skim

The edges and parts of this alcove with a cupboard needed to be made good and skimmed.

top corner of arch

This took half a day for a customer in Huntingdon.

Other pictures of the work in progress are shown below.

 

 

 

 

 

 

 

old egdeold plasterin progress

Share

Garage conversion for office space

1 200 x 250 brick wallThis garage conversion created space for 3 office workstations plus a reception room.

 

 

 

 

 

 

 

2 200 x 250 knocking through3 200 x 250 knocked through

 

 

 

 

 

 

 

4 200 x 250 insulation 15 200 x 250 insulation 2

 

 

 

 

 

 

 

6 200 x 250 insulation 37 300 x 250 insulation 4

 

 

 

 

 

 

 

8 300 x 250 plastering 19 300 x 250 skimmed other room

 

 

 

 

 

 

 

10 300 x 250 skimmed back door

 

 

 

 

 

 

 

11 300 x 250 skimmed back door 2

 

 

 

 

 

 

 

12 300 x 250 skimmed looking through 1

 

 

 

 

 

 

 

13 250 x 300 offices 1

 

 

 

 

 

 

 

 

14 250 x 300 offices 2

 

 

 

 

 

 

 

 

15 250 x 300 offices 3

 

 

 

 

 

 

 

 

16 250 x 300 offices 4

Share

Bathroom refit with tile inserts

1 300 x 200 bath 1This bathroom was refitted to change the toilet, basin, radiator, bath and shower. 

The tiles used had different coloured inserts

 

 

 

2 300 x 200 bath 2

 

 

 

 

 

 

3 300 x 200 bath tiling before grout and inserts

 

 

 

 

 

 

4 300 x 200 toilet and basin

 

 

 

 

 

 

5 300 x 200 basin

 

 

 

 

 

 

6 200 x 250 bath and shower7 200 x 250

 

 

 

 

 

 

 

8 200 x 250 radiator9 200 x 250 shower

 

 

 

 

 

 

 

10 200 x 25011 200 x 250 green tile insert

Share

Ceiling repair and plumbing leak fix

1 300 x 250 ceiling skimWe fixed a plumbing leak and repaired the ceiling and skimmed the ceiling smooth.

 

 

 

 

 

 

2 250 x 250 plumbing

 

 

 

 

 

 

 

3 250 x 300 plumbing

 

 

 

 

 

 

 

 

4 250 x 300 ceiling

Share

Bathroom refit with basin unit

1 250 x 200 bath controlsFor this bathroom refit the bath, basin, toilet, shower and radiator were replaced and the basin was mounted onto a vanity unit with marble top.

 

 

 

 

2 250 x 300 basin unit

 

 

 

 

 

 

 

 

3 250 x 300 shower 1

 

 

 

 

 

 

 

 

5 250 x 300 radiator 1

 

 

 

 

 

 

 

 

4 250 x 300 valve

 

 

 

 

 

 

 

 

6 250 x 300 radiator 2

 

 

 

 

 

 

 

 

7 250 x 300 basin unit

Share

Bathroom refit cream tiles and border

1 250 x 300 basin and tilingThis bathroom refit near Peterborough replaced the toilet, basin, bath, radiator and shower.  The ceiling was skimmed smooth and the floor and walls were tiled.

 

 

 

 

 

 

2 250 x 300 tiled floor

 

 

 

 

 

 

 

 

3 250 x 300 basin and toilet

 

 

 

 

 

 

 

 

4 250 x 300 basin toilet and radiator

 

 

 

 

 

 

 

 

5 250 x 300 bath

 

 

 

 

 

 

 

 

6 250 x 300 shower

Share
Reddit button Linkedin button Delicious button Digg button Flickr button Youtube button
Content Protected Using Blog Protector By: PcDrome.

Featuring Recent Posts Wordpress Widget development by YD